HomePortalCalendarGalleryFAQRegisterLog in

Share | 
 

 Barrelhand Timepiece's new Project 1

View previous topic View next topic Go down 
AuthorMessage
AtomicTom
Senior Consigliere


Posts : 12810
Join date : 2009-08-25
Age : 45
Location : New Jersey

PostSubject: Barrelhand Timepiece's new Project 1   Tue Feb 14, 2017 3:34 pm

Did everyone catch this one from up, and coming watch company Barelhand Timepieces?

They are based right in San Francisco, with Mr. Karel Bachand being the man behind
everything. He even was invited to URWERK after being inspired to build his own UR-202.

The Project 1's aim is to create different kinds of time display complications by using modern
3D printing in-house to reduce research, and development costs. With the watch featuring
a 12-point Geneva jump hour, along with amazing linear minute display system.

Here is a look...











A Blog to Watch, and Barrelhand Timepieces with a lot more...

[You must be registered and logged in to see this link.]

[You must be registered and logged in to see this link.]

____________________________________
Back to top Go down
 
Barrelhand Timepiece's new Project 1
View previous topic View next topic Back to top 
Page 1 of 1
 Similar topics
-
» Belgium Aztec GT project
» TRD AE86 N2 Race Car Project build log
» Project Peenemünde!
» 2001 VW Microbus Project - Reinstated!!
» T4 Project

Permissions in this forum:You cannot reply to topics in this forum
The Lounge - Watch Forum :: Welcome To The Lounge! :: General Watch Discussion... :: Watch Industry News-
Jump to: